|
[Dunia]
Lantai Bangunan Stock Exchange Indon Runtuh...
[Copy link]
|
|
Edited by pyropura at 16-1-2018 09:58 PM
amno replied at 16-1-2018 09:49 PM
malon tongong kantoi lagi ,ko faham tak dengan cawangan anak syarikat ??memalukan rakyat maleysi ...
Indon tak paham engris, baca 99# ngok, yg ko tepek itu bukan sumber Mulia, |
|
|
|
|
|
|
|
malon kantoi tongong tak faham makna anak syarikat lalu nak konar lagi
|
|
|
|
|
|
|
|
amno replied at 16-1-2018 09:58 PM
malon kantoi tongong tak faham makna anak syarikat lalu nak konar lagi
Baca 99#, sejak bila Mulia membina Ex 106? Paham engris tak? |
|
|
|
|
|
|
|
malon masih tak faham makna anak syarikat lagi dia hengat pengarahnya orang malaysie make syarikat itu asal maleysie
|
|
|
|
|
|
|
|
Edited by pyropura at 16-1-2018 10:28 PM
amno replied at 16-1-2018 09:58 PM
malon kantoi tongong tak faham makna anak syarikat lalu nak konar lagi
Indon kantoi tak reti engris 100#,
So, tak baca sumber Mulia Group 99#,
Developer = membina, katanya
|
|
|
|
|
|
|
|
Edited by pyropura at 16-1-2018 10:27 PM
amno replied at 16-1-2018 10:02 PM
malon masih tak faham makna anak syarikat lagi dia hengat pengarahnya orang malaysie make syarikat ...
Patut lar Mulia group indon pilih engineer Malon dan kontraktor Cinak bina Exchange 106, ternyata indon bina veranda aja kagak ngerti abis runtuh rantah
.... IDX Building Collapse Likely Due to Failing S
Jakarta. An initial analysis has found that the collapse of a mezzanine floor at the Indonesia Stock Exchange, or IDX, in Jakarta on Monday (15/01) was likely caused by failing support cables, or "slings," which anchored the floor to the rest of the structure
, the team's preliminary conclusion lists as possible causes for the incident, a weakening of the slings, bolts and clamps due to corrosion; broken or loose bolts and clamps; or a failure of the steel joint that connected the floor to the rest of the building.
|
|
|
|
|
|
|
|
IDX Building Collapse Likely Due to Failing Support Cables:
.... An initial analysis has found that the collapse of a mezzanine floor at the Indonesia Stock Exchange (IDX) in Jakarta on Monday (15/01) was likely caused by failing support cables, or 'slings,' which anchored the floor to the rest of the structure. (JG Photo/Yudha Baskoro) (Antara Photo/Elo)
By Telly Nathalia on 7:32 pm Jan 16, 2018
Category News , Jakarta , Disasters
Jakarta. An initial analysis has found that the collapse of a mezzanine floor at the Indonesia Stock Exchange, or IDX, in Jakarta on Monday (15/01) was likely caused by failing support cables, or "slings," which anchored the floor to the rest of the structure.
A team from the Ministry of Public Works and Housing conducted a three-hour inspection of the ruins and found that no structural maintenance had been carried out on the affected part of the building.
The mezzanine floor, which was partly suspended from above by the slings, was not a later addition, but part of the original blueprint, the team said in a report seen by the Jakarta Globe on Tuesday.
Based on interviews with witnesses, closed circuit television footage and photos of the damaged structure, the team's preliminary conclusion lists as possible causes for the incident, a weakening of the slings, bolts and clamps due to corrosion; broken or loose bolts and clamps; or a failure of the steel joint that connected the floor to the rest of the building.
However, the team was not allowed to directly inspect the damaged structure and the debris up close.
"It is an unofficial, preliminary report of an analysis by staff of the Public Works Ministry," the ministry's public relations unit said in a statement on Tuesday. |
|
|
|
|
|
|
|
ya awloh malon tongong kantoi lagi ko hengat indon yang kate ke itu media malon sendiri yang kate tongong
http://www.themalaymailonline.co ... JtJugKOIPArw5wAi.97
Exchange 106, yang dibina anak syarikat Mulia Group dari Indonesia, di Tun Razak Exchange bukan hanya tertinggi di Malaysia tetapi juga di Asia Tenggara.
|
|
|
|
|
|
|
|
media mane yang kate kontraktornye cine??malon kantoi tongong lagi dah dia sendiri syarikat kontraktor apasal nak ambik kontraktor lagi
|
|
|
|
|
|
|
|
malon kantoi tongong #101 #103 #106 #102
|
|
|
|
|
|
|
|
Edited by pyropura at 16-1-2018 11:14 PM
amno replied at 16-1-2018 10:39 PM
media mane yang kate kontraktornye cine??malon kantoi tongong lagi dah dia sendiri syarikat kontra ...
Sebab Mulia Group tak punya kepakaran bina gedung 100 tingkat, tu pasal ambikMainCon cinak, arkitek HK, Structural (rangka) & MEP Engineering dari Malon... indon bikin veranda IDX aja runtuh rantah ... paham?
******************************
Developer : Mulia Group
Architect:
- Design: Peter Chan Architect
- Architect of Record: Mulia Group
Structural Engineer:
- Design: EDP Consulting Group Sdn/Bhd
MEP Engineer:
- Design: Beca Group; Primetech Engineers Sdn. Bhd.
Main Contractor: China State Construction Engineering Corporation
Other Consultant:
- Landscape: INSITE Landscape Architects
Material Supplier:
- Cladding: Euro Facade Tech
- Formwork: Doka Formwork Malaysia Sdn |
|
|
|
|
|
|
|
tulisan syok sendiri lagi develop bukan membina betapa tongongnya rakyat malon tak faham english
Developer = membina, katanya
http://www.themalaymailonline.co ... JtJugKOIPArw5wAi.97
Exchange 106, yang dibina anak syarikat Mulia Group dari Indonesia, di Tun Razak Exchange bukan hanya tertinggi di Malaysia tetapi juga di Asia Tenggara.
|
|
|
|
|
|
|
|
amno replied at 16-1-2018 11:13 PM
tulisan syok sendiri lagi develop bukan membina betapa tongongnya rakyat malon tak faham english ; ...
Pegi check Skyscrapercity untuk bende2 teknikal gitu, MM tu berita general aje, they dont observe technical term .... tengok nih, kat Para berikutnya dibilang "dibangunkan", earlier dia cakap "dibina"... paham?
Dibangunkan Mulia Property Development Sdn Bhd, ia dijangka siap Jun tahun depan. |
|
|
|
|
|
|
|
Edited by amno at 16-1-2018 11:25 PM
tulisan karangan syok sendiri malon tolol sahaje yang percaye cer tepek kontraktor cine itu sendiri link nye ade sebut bangun tower malon punye?? , kerajaan malon sendiri mengakui mainconnnya ialah indon punye
utusex sahaje media rasmi kerajaan malon mengakui yang main con nya ialah mulia indon punye
http://www.utusan.com.my/bisnes/ ... lan-lancar-1.428262
Signature Tower iaitu menara setinggi 92 tingkat yang merupakan pembangunan utama projek itu dibangunkan oleh Mulia Group.
|
|
|
|
|
|
|
|
Edited by pyropura at 17-1-2018 12:15 AM
amno replied at 16-1-2018 11:21 PM
kok diem lon ?? @pyropura
utusex sahaje media rasmi kerajaan malon mengakui yang main con nya ...
- Developer - pemaju/pembangun (Mulia Group)
- Builder/constructor - pembina/buat (China SCEC Ltd)
Paham? Nampak Utuseks tu lebih accurate istilahnya dibanding Malaymail. |
|
|
|
|
|
|
|
amno replied at 16-1-2018 11:21 PM
kok diem lon ?? @pyropura
utusex sahaje media rasmi kerajaan malon mengakui yang main con nya ...
Btw, Malon memang hebat kepakarannya dalam bidang structural /frame (komponen paling penting buat gedung). Contoh Burj Khalifah tertinggi dunia Malon (Eversendai) yg bikin frame nya... so no surprise Mulia Indon pilih Malon.
https://www.thenational.ae/uae/building-platform-at-the-pinnacle-of-the-burj-khalifa-was-a-tall-order-1.454505
... Building platform at the pinnacle of the Burj Khalifa was a tall order
The structure was taken piece by piece in lifts to the 159th floor, and then had to be hauled up the remainder of the structure using a cradle and, finally, by rope-hauling systems.
The construction firm Eversendai built the platform itself, and every effort was made to ensure the stunt went off without a hitch.
Prior to installation, a mock-up of the project was made at Eversendai’s building yard in Ajman, and minor adjustments were made to make it as safe as possible.
http://eversendai.irchartnexus.com/images/contentimages/footerImages/20090624002725_DSC_0793c.JPG
|
|
|
|
|
|
|
|
Edited by amno at 17-1-2018 12:21 AM
pyropura replied at 16-1-2018 11:56 PM
Developer - pemaju/pembangun
Build/construct - bina/buat
mana jadi link cina scec main connya?? malon khayalan tongong sendiri; kantoi lagi |
|
|
|
|
|
|
|
Edited by amno at 17-1-2018 12:20 AM
pyropura replied at 17-1-2018 12:05 AM
Btw, Malon memang hebat kepakarannya dalam bidang structural /frame (komponen paling penting buat ...
tak ada link website dari syarikat cina scec nye yg jadi main contractornya malon kantoi tongong lagi |
|
|
|
|
|
|
|
amno replied at 17-1-2018 12:14 AM
tak ada link website dari syarikat cina scec nye yg jadi main contractornya malon kantoi tongong ...
.... Aku ambik sumber yang berkecuali, website construction journal dari Dubai...
https://structurae.net/products-services/signature-tower-will-be-kuala-lumpur-s-new-landmark
Project owner of the new high-rise building is Indonesia's Mulia Group, which has planned the structure with 92 floors primarily as office space. The individual floors average 3,100 m in size. There are no interior columns. Lead contractor on this build is China State Construction Engineering Corporation. Doka was selected as formwork technology partner based on its many years' |
|
|
|
|
|
|
| |
|