Author: dcruins

[Dunia] Lantai Bangunan Stock Exchange Indon Runtuh...

  [Copy link]
Post time 16-1-2018 09:57 PM From the mobile phone | Show all posts
Edited by pyropura at 16-1-2018 09:58 PM
amno replied at 16-1-2018 09:49 PM
malon tongong kantoi lagi ,ko faham  tak dengan cawangan anak syarikat  ??memalukan rakyat maleysi ...


Indon tak paham engris, baca 99# ngok, yg ko tepek itu bukan sumber Mulia,
Reply

Use magic Report


ADVERTISEMENT


Post time 16-1-2018 09:58 PM | Show all posts
pyropura replied at 16-1-2018 09:57 PM
Indon tak paham engris, baca

malon kantoi tongong tak faham makna anak syarikat lalu nak konar lagi
Reply

Use magic Report

Post time 16-1-2018 10:00 PM From the mobile phone | Show all posts
amno replied at 16-1-2018 09:58 PM
malon kantoi tongong tak faham makna anak syarikat lalu nak konar lagi

Baca 99#, sejak bila Mulia membina Ex 106? Paham engris tak?
Reply

Use magic Report

Post time 16-1-2018 10:02 PM | Show all posts
pyropura replied at 16-1-2018 10:00 PM
Baca 99#, sejak bila Mulia membina Ex 106? Paham engris tak?

malon masih tak faham makna anak syarikat lagi dia hengat pengarahnya orang malaysie make syarikat itu asal maleysie  
Reply

Use magic Report

Post time 16-1-2018 10:15 PM From the mobile phone | Show all posts
Edited by pyropura at 16-1-2018 10:28 PM
amno replied at 16-1-2018 09:58 PM
malon kantoi tongong tak faham makna anak syarikat lalu nak konar lagi


Indon kantoi tak reti engris 100#,
So, tak baca sumber Mulia Group 99#,
Developer = membina,   katanya
Reply

Use magic Report

Post time 16-1-2018 10:22 PM From the mobile phone | Show all posts
Edited by pyropura at 16-1-2018 10:27 PM
amno replied at 16-1-2018 10:02 PM
malon masih tak faham makna anak syarikat lagi dia hengat pengarahnya orang malaysie make syarikat ...


Patut lar Mulia group indon pilih engineer Malon dan kontraktor Cinak bina Exchange 106, ternyata indon bina veranda aja kagak ngerti abis runtuh rantah


.... IDX Building Collapse Likely Due to Failing S

Jakarta. An initial analysis has found that the collapse of a mezzanine floor at the Indonesia Stock Exchange, or IDX, in Jakarta on Monday (15/01) was likely caused by failing support cables, or "slings," which anchored the floor to the rest of the structure

, the team's preliminary conclusion lists as possible causes for the incident, a weakening of the slings, bolts and clamps due to corrosion; broken or loose bolts and clamps; or a failure of the steel joint that connected the floor to the rest of the building.
Reply

Use magic Report

Follow Us
Post time 16-1-2018 10:24 PM From the mobile phone | Show all posts
IDX  Building Collapse Likely Due to Failing Support Cables:

.... An initial analysis has found that the collapse of a mezzanine floor at the Indonesia Stock Exchange (IDX) in Jakarta on Monday (15/01) was likely caused by failing support cables, or 'slings,' which anchored the floor to the rest of the structure. (JG Photo/Yudha Baskoro) (Antara Photo/Elo)

By Telly Nathalia on 7:32 pm Jan 16, 2018

Category News ,        Jakarta ,        Disasters
Jakarta. An initial analysis has found that the collapse of a mezzanine floor at the Indonesia Stock Exchange, or IDX, in Jakarta on Monday (15/01) was likely caused by failing support cables, or "slings," which anchored the floor to the rest of the structure.

A team from the Ministry of Public Works and Housing conducted a three-hour inspection of the ruins and found that no structural maintenance had been carried out on the affected part of the building.

The mezzanine floor, which was partly suspended from above by the slings, was not a later addition, but part of the original blueprint, the team said in a report seen by the Jakarta Globe on Tuesday.

Based on interviews with witnesses, closed circuit television footage and photos of the damaged structure, the team's preliminary conclusion lists as possible causes for the incident, a weakening of the slings, bolts and clamps due to corrosion; broken or loose bolts and clamps; or a failure of the steel joint that connected the floor to the rest of the building.

However, the team was not allowed to directly inspect the damaged structure and the debris up close.

"It is an unofficial, preliminary report of an analysis by staff of the Public Works Ministry," the ministry's public relations unit said in a statement on Tuesday.
Reply

Use magic Report

Post time 16-1-2018 10:38 PM | Show all posts
pyropura replied at 16-1-2018 10:15 PM
Indon kantoi tak reti engris 100#,
So, tak baca sumber Mulia Group 99#,
Developer = membina,   ...

ya awloh malon tongong kantoi lagi ko hengat indon yang kate ke itu media malon sendiri yang kate tongong

http://www.themalaymailonline.co ... JtJugKOIPArw5wAi.97

Exchange 106, yang dibina anak syarikat Mulia Group dari Indonesia, di Tun Razak Exchange bukan hanya tertinggi di Malaysia tetapi juga di Asia Tenggara.
Reply

Use magic Report


ADVERTISEMENT


Post time 16-1-2018 10:39 PM | Show all posts
pyropura replied at 16-1-2018 10:22 PM
Patut lar Mulia group indon pilih engineer Malon dan kontraktor Cinak bina Exchange 106, ternyat ...

media mane yang kate kontraktornye cine??malon kantoi tongong lagi dah dia sendiri syarikat kontraktor apasal nak ambik kontraktor lagi  
Reply

Use magic Report

Post time 16-1-2018 10:43 PM | Show all posts
pyropura replied at 16-1-2018 10:24 PM
IDX  Building Collapse Likely Due to Failing Support Cables:

.... An initial analysis has found t ...

malon kantoi tongong #101 #103 #106 #102
Reply

Use magic Report

Post time 16-1-2018 11:11 PM From the mobile phone | Show all posts
Edited by pyropura at 16-1-2018 11:14 PM
amno replied at 16-1-2018 10:39 PM
media mane yang kate kontraktornye cine??malon kantoi tongong lagi dah dia sendiri syarikat kontra ...


Sebab Mulia Group tak punya kepakaran bina gedung 100 tingkat, tu pasal ambikMainCon cinak, arkitek HK, Structural (rangka) & MEP Engineering  dari Malon... indon bikin veranda IDX  aja runtuh rantah ...  paham?

******************************
Developer : Mulia Group
Architect:
- Design: Peter Chan Architect
- Architect of Record:  Mulia Group

Structural Engineer:
- Design: EDP Consulting Group Sdn/Bhd

MEP Engineer:
- Design: Beca Group;        Primetech Engineers Sdn. Bhd.

Main Contractor: China State Construction Engineering Corporation

Other Consultant:
- Landscape: INSITE Landscape Architects

Material Supplier:
- Cladding: Euro Facade Tech
- Formwork: Doka Formwork Malaysia Sdn
Reply

Use magic Report

Post time 16-1-2018 11:13 PM | Show all posts
pyropura replied at 16-1-2018 11:11 PM
Sebab Mulia Group tak punya kepakaran bina gesung 100 tingkat, tu pasal ambikMainCon cinak, arki ...

tulisan syok sendiri lagi develop bukan membina betapa tongongnya rakyat malon tak faham english

Developer = membina,   katanya


http://www.themalaymailonline.co ... JtJugKOIPArw5wAi.97

Exchange 106, yang dibina anak syarikat Mulia Group dari Indonesia, di Tun Razak Exchange bukan hanya tertinggi di Malaysia tetapi juga di Asia Tenggara.
Reply

Use magic Report

Post time 16-1-2018 11:20 PM From the mobile phone | Show all posts
amno replied at 16-1-2018 11:13 PM
tulisan syok sendiri lagi develop bukan membina betapa tongongnya rakyat malon tak faham english ; ...

Pegi check Skyscrapercity untuk bende2 teknikal gitu, MM tu berita general  aje, they dont observe technical term .... tengok nih, kat Para berikutnya dibilang "dibangunkan", earlier dia cakap "dibina"... paham?

Dibangunkan Mulia Property Development Sdn Bhd, ia dijangka siap Jun tahun depan.
Reply

Use magic Report

Post time 16-1-2018 11:21 PM | Show all posts
kok diem lon ?? @pyropura

utusex sahaje media rasmi kerajaan malon mengakui yang main con nya ialah mulia indon punye

http://www.utusan.com.my/bisnes/korporat/pembangunan-8232-trx-berjalan-lancar-1.428262

Signature Tower iaitu menara setinggi 92 tingkat yang merupakan pembangunan utama projek itu dibangunkan oleh Mulia Group.
Reply

Use magic Report

Post time 16-1-2018 11:22 PM | Show all posts
Edited by amno at 16-1-2018 11:25 PM
pyropura replied at 16-1-2018 11:20 PM
Pegi check Skyscrapercity untuk bende2 teknikal gitu, MM tu berita general  aje, they dont observe ...

tulisan karangan syok  sendiri malon tolol sahaje yang percaye cer tepek kontraktor cine itu sendiri link nye ade sebut bangun tower malon punye?? , kerajaan malon sendiri mengakui mainconnnya ialah indon punye


utusex sahaje media rasmi kerajaan malon mengakui yang main con nya ialah mulia indon punye

http://www.utusan.com.my/bisnes/ ... lan-lancar-1.428262

Signature Tower iaitu menara setinggi 92 tingkat yang merupakan pembangunan utama projek itu dibangunkan oleh Mulia Group.

Reply

Use magic Report

Post time 16-1-2018 11:56 PM From the mobile phone | Show all posts
Edited by pyropura at 17-1-2018 12:15 AM
amno replied at 16-1-2018 11:21 PM
kok diem lon ?? @pyropura

utusex sahaje media rasmi kerajaan malon mengakui yang main con nya  ...


- Developer - pemaju/pembangun (Mulia Group)
- Builder/constructor - pembina/buat (China SCEC Ltd)

Paham? Nampak Utuseks tu lebih accurate istilahnya dibanding Malaymail.
Reply

Use magic Report


ADVERTISEMENT


Post time 17-1-2018 12:05 AM From the mobile phone | Show all posts
amno replied at 16-1-2018 11:21 PM
kok diem lon ?? @pyropura

utusex sahaje media rasmi kerajaan malon mengakui yang main con nya  ...

Btw, Malon memang hebat kepakarannya dalam bidang structural /frame (komponen paling penting buat gedung). Contoh Burj Khalifah tertinggi dunia Malon (Eversendai)  yg bikin frame nya... so no surprise Mulia Indon pilih Malon.

https://www.thenational.ae/uae/building-platform-at-the-pinnacle-of-the-burj-khalifa-was-a-tall-order-1.454505

... Building platform at the pinnacle of the Burj Khalifa was a tall order

The structure was taken piece by piece in lifts to the 159th floor, and then had to be hauled up the remainder of the structure using a cradle and, finally, by rope-hauling systems.

The construction firm Eversendai built the platform itself, and every effort was made to ensure the stunt went off without a hitch.

Prior to installation, a mock-up of the project was made at Eversendai’s building yard in Ajman, and minor adjustments were made to make it as safe as possible.



http://eversendai.irchartnexus.com/images/contentimages/footerImages/20090624002725_DSC_0793c.JPG

Reply

Use magic Report

Post time 17-1-2018 12:13 AM From the mobile phone | Show all posts
Edited by amno at 17-1-2018 12:21 AM
pyropura replied at 16-1-2018 11:56 PM
Developer - pemaju/pembangun
Build/construct - bina/buat



mana jadi link cina scec main connya?? malon khayalan tongong sendiri; kantoi lagi
Reply

Use magic Report

Post time 17-1-2018 12:14 AM From the mobile phone | Show all posts
Edited by amno at 17-1-2018 12:20 AM
pyropura replied at 17-1-2018 12:05 AM
Btw, Malon memang hebat kepakarannya dalam bidang structural /frame (komponen paling penting buat  ...


tak ada link website dari syarikat cina scec nye yg jadi main contractornya malon kantoi tongong lagi
Reply

Use magic Report

Post time 17-1-2018 12:26 AM From the mobile phone | Show all posts
amno replied at 17-1-2018 12:14 AM
tak ada link website dari syarikat cina scec nye yg jadi main contractornya malon kantoi tongong ...

.... Aku ambik sumber yang berkecuali, website construction journal dari Dubai...

https://structurae.net/products-services/signature-tower-will-be-kuala-lumpur-s-new-landmark

Project owner of the new high-rise building is Indonesia's Mulia Group, which has planned the structure with 92 floors primarily as office space. The individual floors average 3,100 m in size. There are no interior columns. Lead contractor on this build is China State Construction Engineering Corporation. Doka was selected as formwork technology partner based on its many years'
Reply

Use magic Report

You have to log in before you can reply Login | Register

Points Rules

 

ADVERTISEMENT



 

ADVERTISEMENT


 


ADVERTISEMENT
Follow Us

ADVERTISEMENT


Mobile|Archiver|Mobile*default|About Us|CARI Infonet

28-3-2024 04:08 PM GMT+8 , Processed in 0.066372 second(s), 42 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

Quick Reply To Top Return to the list