CariDotMy

 Forgot password?
 Register

ADVERTISEMENT

View: 2280|Reply: 16

[Tempatan] Lagi extra cost RM94 juta baiki KLIA2

[Copy link]
Post time 29-3-2016 09:21 AM | Show all posts |Read mode
KUALA LUMPUR: Malaysia Airports Holdings Bhd (MAHB) has spent RM94 million to repair the aircraft parking apron at the Kuala Lumpur International Airport 2 (KLIA2), the Dewan Rakyat was told today.

The Transport Ministry said the parking apron at the terminal was affected by ponding and soil depression and works would continue to be carried out until the surface was stabilised.

It was responding to a question from Hee Loy Sian (PKR-Petaling Jaya Selatan) who wanted to know the status of repair works on the aircraft parking apron and action against contractors responsible for the defects.

The ministry said KLIA2 was built by contractors based on the designs produced by the consultants appointed, which abided by the design requirements during construction, but the defects liability period had expired.

Hence, MAHB is looking into whether the consultants had carried out their responsibilities accordingly in planning and designing the layout by taking into consideration soil depression during earthworks, the ministry said.

“If there was any negligence, MAHB will take action against the consultants based on the terms and conditions of their appointment,” it said.

-BERNAMA
Reply

Use magic Report


ADVERTISEMENT


Post time 29-3-2016 09:24 AM From the mobile phone | Show all posts
Hahahahah......magic word..."EXPIRED"
Reply

Use magic Report

 Author| Post time 29-3-2016 09:26 AM | Show all posts
Reply

Use magic Report

Post time 29-3-2016 09:27 AM From the mobile phone | Show all posts
Kalo tambah 96 jota, berape total cost Semua??
Reply

Use magic Report

Post time 29-3-2016 09:36 AM | Show all posts
jilake cina dap
Reply

Use magic Report

 Author| Post time 29-3-2016 09:40 AM | Show all posts
RM3.92 bilion + RM94 million
Reply

Use magic Report

Follow Us
Post time 29-3-2016 10:05 AM From the mobile phone | Show all posts
Kawtim banyak sangat.ni.pakai barang cap ayamm.
Reply

Use magic Report

Post time 29-3-2016 10:22 AM | Show all posts
bekki jgn tak bekki.. duit mariiiii~
Reply

Use magic Report


ADVERTISEMENT


Post time 29-3-2016 01:48 PM From the mobile phone | Show all posts
Haritu gopoh sgat nak bukak cepat siap claim lagi murah pelbagai. Ujong2 rosak sana sini nak perbaik lagi dah jadi mahal. Bodoh betul contractor dungu kaki rasuah guna brg murah jah. Mohon merepot lah cilake tersebut!
Reply

Use magic Report

Post time 29-3-2016 06:48 PM | Show all posts
kawasan paya dan tanah gambut
senang terbenam
Reply

Use magic Report

Post time 29-3-2016 10:43 PM | Show all posts
Wang kena 1malaysia sapu lagi
Reply

Use magic Report

Post time 30-3-2016 12:51 AM From the mobile phone | Show all posts
dodolgemok replied at 29-3-2016 01:48 PM
Haritu gopoh sgat nak bukak cepat siap claim lagi murah pelbagai. Ujong2 rosak sana sini nak perbaik ...

Airport tmpt hang sebijik cm puduraya...ada hati pulak nak kutuk2 orng...x tau malu ka?
Reply

Use magic Report

Post time 30-3-2016 07:50 AM | Show all posts
Pembinaan KLIA2 paling murah dan cepat di dunia - Aziz Kaprawi
T K Letchumy Tamboo, Astro Awani | Jun 10, 2014 15:40 MYT
Reply

Use magic Report

Post time 30-3-2016 07:51 AM | Show all posts
umno da tipu/rasuah berpisah teda

Kerajaan BN terus berbohong tentang kos pembinaan KLIA 2
1 April 2014
KUALA LUMPUR, 1 APR: Kerajaan Barisan Nasional (BN) untuk ke sekian kalinya menipu rakyat berhubung kos pembinaan Lapangan Terbang Antarabangsa Kuala Lumpur 2 (KLIA2) apabila Timbalan Menteri Pengangkutan Dato’ Abdul Aziz Kaprawi akhirnya mengakui bahawa pembinaan lapangan terbang itu akan menelan kos lebih dari RM4 bilion.

Menurut Ahli Parlimen DAP Petaling Jaya Utara Tony Pua, kerajaan telah berulangkali menegaskan bahawa kos pembinaan KLIA2 tidak akan melebihi RM4 bilion setelah CEO AirAsia Group Tan Sri Tony Fernandes membuat dakwaan pada bulan Julai 2012 bahawa kos pembinaan lapangan terbang berkenaan telah mencecah RM5 bilion.

“Pada bulan Oktober 2012, kita diberitahu di Parlimen oleh Timbalan Menteri Pengangkutan ketika itu, Dato’ Abdul Rahim Bakri, bahawa kos pembinaan telah meningkat kepada RM4 bilion. Pemangku Menteri Pengangkutan sekarang, Dato’ Seri Hishammuddin pada bulan Ogos 2013 menegaskan bahawa kos pembinaan tidak akan melebihi RM4 bilion.

Pada 9 Februari tahun ini, Dato’ Abdul Aziz Kaprawi yang kini mengetuai Jawatankuasa Khas Kabinet berkenaan KLIA2 sekali lagi mengesahkan bahawa kos lapangan terbang itu tidak akan melebihi RM4 bilion walaupun perkara itu diragui oleh beberapa pihak dalam industri terbabit.”

Bagaimanapun, Aziz dalam laporan The Edge kelmarin mengakui bahawa Financial Daily bahawa kos KLIA2 adalah lebih daripada RM4 bilion berikutan perubahan dalam skop kerja dan “perkara lain yang tidak dijangka,” tanpa menyebut secara jelas sebesar mana peningkatan kos.

Aziz dilaporkan telah menerima taklimat dari pegawai MAHB mengenai peningkatan kos KLIA 2 yang menurut beliau akan ditanggung syarikat pengendali lapangan terbang bukannya dana awam, namun bagi Tony Pua Malaysia Airports Holdings Berhad (MAHB) adalah syarikat milik kerajaan yang telah diamanahkan dengan wang rakyat.

“MAHB khususnya dengan jelas menunjukkan ketidakcekapan, salah urus dan menyembunyikannya dengan menggunakan penipuan serta pembohongan secara terang-terangan,” katanya dalam satu kenyataan awal pagi tadi.

Beliau yang juga Setiausaha Publisiti DAP Kebangsaan menggesa Perdana Menteri Datuk Seri Najib Razak mengambil tindakan tegas terhadap pengurusan atasan MAHB.

Katanya lagi, Menteri Pengangkutan juga harus dikenakan tindakan kerana gagal memantau MAHB.

“Paling penting, kontrak Tan Sri Bashir Ahmad Abdul Majid yang telah dilanjutkan dua kali sejak kos pembinaan KLIA2 melonjak kepada RM4 bilion mesti ditamatkan serta-merta,” ujar Tony.

Menurut beliau lagi, Najib perlu menghukum Bashir untuk memberi peringatan kepada semua GLC lain bahawa atau beliau tidak akan bertolak-ansur dengan ketidakcekapan dan salah-urus yang melibatkan pembohongan terang-terangan.

Bajet awal KLIA2 ketika kali pertama diumumkan Menteri Pengangkutan, Datuk Seri Ong Tee Keat pada Julai 2007 adalah sebanyak RM1.7 bilion.

Jumlah berkenaan kemudian meningkat kepada RM2.0 bilion pada Mac 2009, RM2.5 bilion pada Oktober 2010 dan MAHB pada November 2011 memaklumkan bahawa kos KLIA2 meningkat sehingga RM3.9 bilion.
Reply

Use magic Report

Post time 30-3-2016 10:38 AM | Show all posts
wana89 replied at 29-3-2016 09:27 AM
Kalo tambah 96 jota, berape total cost Semua??

ini sume sbb tanah kelapa sawit tu. mesti soil treatment ade slack mne2
Reply

Use magic Report

Post time 30-3-2016 10:42 AM From the mobile phone | Show all posts
qronaldo7 replied at 30-3-2016 10:38 AM
ini sume sbb tanah kelapa sawit tu. mesti soil treatment ade slack mne2

Kaw kelapa sawit biasa tanah apa?? Senang mendap.. KLIA aman2 jer
Reply

Use magic Report


ADVERTISEMENT


Post time 30-3-2016 10:45 AM | Show all posts
wana89 replied at 30-3-2016 10:42 AM
Kaw kelapa sawit biasa tanah apa?? Senang mendap.. KLIA aman2 jer

gambut.. tanah tu kurg padat. kalau salah wat rawatan tanah mmg mendap la.
klia tu rasanya mmg betul dorg wat. klia 2 ni kan nk kejar masa. tkut ade missing
Reply

Use magic Report

You have to log in before you can reply Login | Register

Points Rules

 

ADVERTISEMENT



 

ADVERTISEMENT


 


ADVERTISEMENT
Follow Us

ADVERTISEMENT


Mobile|Archiver|Mobile*default|About Us|CariDotMy

30-11-2024 11:02 PM GMT+8 , Processed in 0.086352 second(s), 30 queries , Gzip On, Redis On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

Quick Reply To Top Return to the list